Benzel, chairperson, called the meeting to order at 7:30pm in the township building.
Additional commissioners present were Susan Beach, MaryNell Ferry, Buzz Hannum,
Jr., Pat Montague and Nancy Olson. There was a quorum present.
1. Minutes of January 30, 2007 – Spelling correction item 6. Willowdale Chapel Preliminary Plan. Motion to
approve with correction Commissioner Beach,
2nd
Commissioner Olson. Approved.
2.
Kennett Chevrolet – Preliminary Plan. Presenter Joseph Russella of D. L. Howell
& Associates, Inc. Mr. Russella
provided background information concerning building placement on the parcel,
landscaping design and impervious coverage. The commissioners reviewed the February 23, 2007 letter and
Memorandum of township engineer, James Hatfield, the GTP letter of February 26, 2007 and the T.P.D.
letter of February 20, 2007. It was suggested that directional signage be
provided for south bound exiting traffic to proceed to the Greenwood
Road jug handle. Architectural drawings of
proposed elevations of the building were distributed. Samples of materials
being used were available for examination. The design, materials and colors are in line with other commercial buildings along Route 1
and the commissioners agree that these items are all acceptable. The
commissioners noted that some issues remain as indicated in Mr. Hatfield’s
letter. The applicant has made considerable effort to reengineer the plan to
preserve some trees and revise parking areas. Motion by Commissioner Hannum to
grant preliminary land development approval provided the applicant resolves all
issues with township consultants. Second
Commissioner Beach.
Approved. The commissioners favor the
elevation and architectural renderings provided by the applicant.
3.
Barnsley-Auman-Final
Land Development. Presenter Jesse
Condon of Regester Associates, Inc. The commissioners reviewed with Mr. Condon
the February 26, 2007
letter and memorandum from township engineer James Hatfield. Per item 3 in the
memorandum letter, Mr. Condon indicated that applicant’s plans met township
requirements but the change is acceptable. Motion by Commissioner Montague to
grant approval of Final Land Development Plan conditional on meeting all requirements
of township consultants. Second Commissioner Ferry. Approved.
Adjournment 8:45pm
Respectfully submitted,
Ruth Plaugher, secretary